Supreme Court Declines Review in Percipient.ai, Leaving Bid Protest Interested Party Status Unchanged
Client Alerts
January 16, 2026
By: Noah B. Bleicher, Moshe B. Broder, Elizabeth Pullin, Ginsey V. Kramarczyk
On January 12, 2026, the US Supreme Court denied Percipient.ai, Inc.’s petition for a writ of certiorari, ending a closely watched case that tested the boundaries of bid protest standing at the Court of Federal Claims. The decision leaves intact the Federal Circuit’s en banc ruling that contractors must be actual or prospective bidders to challenge agency procurement decisions, regardless of the nature of the alleged statutory violation.
Percipient, a commercial provider of advanced analytics and artificial intelligence products, filed a 2023 bid protest challenging the National Geospatial-Intelligence Agency’s (NGA) decision to issue an order to CACI, Inc.—Federal for custom “computer vision” technology—a form of artificial intelligence that uses and trains computers to interpret visual information—rather than procure commercially available solutions. Percipient alleged that NGA violated the commercial item procurement preference under 10 U.S.C. § 3453, which requires agencies to acquire commercial products and services “to the maximum extent practicable.” Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093, (Fed. Cl. May 17, 2023).
Notably, Percipient had not bid on the underlying “SAFFIRE” contract—a single-award IDIQ contract for visual intelligence data collection and computer vision capabilities—because it lacked the capability to meet all solicitation requirements. Instead, Percipient awaited post-award market research where it expected to demonstrate that its commercial computer vision product could meet NGA’s needs and be incorporated into the procurement.
Procedural History
Court of Federal Claims (2023): The Court of Federal Claims dismissed the complaint for lack of subject matter jurisdiction, finding the challenge barred under the Federal Acquisition Streamlining Act’s (FASA) task order protest prohibition because NGA’s development decision was “directly and causally related” to the issuance of a task order. Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093 (Fed. Cl. May 17, 2023). Percipient appealed.
Federal Circuit Panel (June 2024): A divided panel (2-1) reversed, holding that (1) Percipient’s allegations were not barred under the FASA task order bar because Percipient was not challenging the issuance of a task order, but rather the post-award failure to comply with section 3453; (2) the Tucker Act conferred jurisdiction because Percipient’s alleged section 3453 violation was “in connection with a procurement or a proposed procurement” under the so-called prong three of section 1491(b)(1); and (3) Percipient had standing to bring its claim challenging NGA’s decision to develop the software. See Percipient.ai, Inc. v. United States, 104 F.4th 839 (Fed. Cir. 2024).
Differentiating between challenges “in connection with” a procurement, and either solicitation challenges or award decisions, the Court concluded that interested party standing for alleged violations of 10 U.S.C. § 3453 without challenging the contract award, “includes an offeror of commercial or nondevelopmental services or items whose direct economic interest would be affected by the alleged violation of the statute.”Id.
En Banc Rehearing (August 2025): The Government successfully petitioned for en banc review. The full court vacated the panel decision and ordered briefing on the question of “[w]ho can be ‘an interested party objecting to . . . any alleged violation of a statute or regulation in connection with a procurement or a proposed procurement under 28 U.S.C. § 1491(b)(1).’”See Percipient.ai, Inc. v. United States, 153 F.4th 1226 (Fed. Cir. 2025).
In its resulting 7-4 decision, authored by Circuit Judge Hughes, the Court of Appeals affirmed the trial court dismissal holding that “an interested party is an actual or prospective bidder or offeror whose direct economic interest would be affected by the award of the contract or by failure to award the contract, regardless of the type of challenge brought[.]”Id. Therefore, Percipient lost its challenge. Because Percipient never bid (and could not have bid) on the SAFFIRE contract, it lacked standing.
Key takeaways:
- The commercial item procurement preference does not confer a separate bid protest right of action outside the parameters of the Tucker Act. Contractors cannot invoke 10 U.S.C. § 3453 to establish standing absent status as an actual or prospective bidder on the procurement at issue.
- Contractors must establish their “interested party” status under the Tucker Act. Regardless of whether a protester challenges a solicitation, an award, or an alleged statutory violation, standing requires that the protester be an actual or prospective bidder whose direct economic interest would be affected by the award or failure to award the contract.
- For traditional post-award bid protests, contractors must be an actual or prospective offeror with a direct economic interest. Am. Fed’n of Gov’t Employees v. United States, 258 F.3d 1294, 1302 (Fed. Cir. 2001).
- In pre-award bid protests, contractors must demonstrate a “non-trivial competitive injury which can be addressed by judicial relief.” Weeks Marine, Inc. v. United States, 575 F.3d 1352, 1362 (Fed. Cir. 2009).
- Where a solicitation restricts a contractor from participating in a competition, prospective bidders should consider challenging the terms of a solicitation or submitting a proposal or quote. If a solicitation contains improper or unduly restrictive requirements, contractors should consider filing a protest before quotes or proposals are due.
Percipient, a commercial provider of advanced analytics and artificial intelligence products, filed a 2023 bid protest challenging the National Geospatial-Intelligence Agency’s (NGA) decision to issue an order to CACI, Inc.—Federal for custom “computer vision” technology—a form of artificial intelligence that uses and trains computers to interpret visual information—rather than procure commercially available solutions. Percipient alleged that NGA violated the commercial item procurement preference under 10 U.S.C. § 3453, which requires agencies to acquire commercial products and services “to the maximum extent practicable.” Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093, (Fed. Cl. May 17, 2023).
Notably, Percipient had not bid on the underlying “SAFFIRE” contract—a single-award IDIQ contract for visual intelligence data collection and computer vision capabilities—because it lacked the capability to meet all solicitation requirements. Instead, Percipient awaited post-award market research where it expected to demonstrate that its commercial computer vision product could meet NGA’s needs and be incorporated into the procurement.
Procedural History
Court of Federal Claims (2023): The Court of Federal Claims dismissed the complaint for lack of subject matter jurisdiction, finding the challenge barred under the Federal Acquisition Streamlining Act’s (FASA) task order protest prohibition because NGA’s development decision was “directly and causally related” to the issuance of a task order. Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093 (Fed. Cl. May 17, 2023). Percipient appealed.
Federal Circuit Panel (June 2024): A divided panel (2-1) reversed, holding that (1) Percipient’s allegations were not barred under the FASA task order bar because Percipient was not challenging the issuance of a task order, but rather the post-award failure to comply with section 3453; (2) the Tucker Act conferred jurisdiction because Percipient’s alleged section 3453 violation was “in connection with a procurement or a proposed procurement” under the so-called prong three of section 1491(b)(1); and (3) Percipient had standing to bring its claim challenging NGA’s decision to develop the software. See Percipient.ai, Inc. v. United States, 104 F.4th 839 (Fed. Cir. 2024).
Differentiating between challenges “in connection with” a procurement, and either solicitation challenges or award decisions, the Court concluded that interested party standing for alleged violations of 10 U.S.C. § 3453 without challenging the contract award, “includes an offeror of commercial or nondevelopmental services or items whose direct economic interest would be affected by the alleged violation of the statute.”Id.
En Banc Rehearing (August 2025): The Government successfully petitioned for en banc review. The full court vacated the panel decision and ordered briefing on the question of “[w]ho can be ‘an interested party objecting to . . . any alleged violation of a statute or regulation in connection with a procurement or a proposed procurement under 28 U.S.C. § 1491(b)(1).’”See Percipient.ai, Inc. v. United States, 153 F.4th 1226 (Fed. Cir. 2025).
In its resulting 7-4 decision, authored by Circuit Judge Hughes, the Court of Appeals affirmed the trial court dismissal holding that “an interested party is an actual or prospective bidder or offeror whose direct economic interest would be affected by the award of the contract or by failure to award the contract, regardless of the type of challenge brought[.]”Id. Therefore, Percipient lost its challenge. Because Percipient never bid (and could not have bid) on the SAFFIRE contract, it lacked standing.
Key takeaways:
- The commercial item procurement preference does not confer a separate bid protest right of action outside the parameters of the Tucker Act. Contractors cannot invoke 10 U.S.C. § 3453 to establish standing absent status as an actual or prospective bidder on the procurement at issue.
- Contractors must establish their “interested party” status under the Tucker Act. Regardless of whether a protester challenges a solicitation, an award, or an alleged statutory violation, standing requires that the protester be an actual or prospective bidder whose direct economic interest would be affected by the award or failure to award the contract.
- For traditional post-award bid protests, contractors must be an actual or prospective offeror with a direct economic interest. Am. Fed’n of Gov’t Employees v. United States, 258 F.3d 1294, 1302 (Fed. Cir. 2001).
- In pre-award bid protests, contractors must demonstrate a “non-trivial competitive injury which can be addressed by judicial relief.” Weeks Marine, Inc. v. United States, 575 F.3d 1352, 1362 (Fed. Cir. 2009).
- Where a solicitation restricts a contractor from participating in a competition, prospective bidders should consider challenging the terms of a solicitation or submitting a proposal or quote. If a solicitation contains improper or unduly restrictive requirements, contractors should consider filing a protest before quotes or proposals are due.
Related Capabilities
© 2026 Jenner & Block LLP. Attorney Advertising. Jenner & Block LLP is an Illinois Limited Liability Partnership including professional corporations. This publication, presentation, or event is not intended to provide legal advice but to provide information on legal matters and/or firm news of interest to our clients and colleagues. Readers or attendees should seek specific legal advice before taking any action with respect to matters mentioned in this publication or at this event. The attorney responsible for this communication is Brent E. Kidwell, Jenner & Block LLP, 353 N. Clark Street, Chicago, IL 60654-3456. Prior results do not guarantee a similar outcome. Jenner & Block London LLP, an affiliate of Jenner & Block LLP, is a limited liability partnership established under the laws of the State of Delaware, USA and is authorised and regulated by the Solicitors Regulation Authority with SRA number 615729. Information regarding the data we collect and the rights you have over your data can be found in our Privacy Notice. For further inquiries, please contact dataprotection@jenner.com.
Client Alerts
January 16, 2026
By: Noah B. Bleicher, Moshe B. Broder, Elizabeth Pullin, Ginsey V. Kramarczyk
On January 12, 2026, the US Supreme Court denied Percipient.ai, Inc.’s petition for a writ of certiorari, ending a closely watched case that tested the boundaries of bid protest standing at the Court of Federal Claims. The decision leaves intact the Federal Circuit’s en banc ruling that contractors must be actual or prospective bidders to challenge agency procurement decisions, regardless of the nature of the alleged statutory violation.
Percipient, a commercial provider of advanced analytics and artificial intelligence products, filed a 2023 bid protest challenging the National Geospatial-Intelligence Agency’s (NGA) decision to issue an order to CACI, Inc.—Federal for custom “computer vision” technology—a form of artificial intelligence that uses and trains computers to interpret visual information—rather than procure commercially available solutions. Percipient alleged that NGA violated the commercial item procurement preference under 10 U.S.C. § 3453, which requires agencies to acquire commercial products and services “to the maximum extent practicable.” Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093, (Fed. Cl. May 17, 2023).
Notably, Percipient had not bid on the underlying “SAFFIRE” contract—a single-award IDIQ contract for visual intelligence data collection and computer vision capabilities—because it lacked the capability to meet all solicitation requirements. Instead, Percipient awaited post-award market research where it expected to demonstrate that its commercial computer vision product could meet NGA’s needs and be incorporated into the procurement.
Procedural History
Court of Federal Claims (2023): The Court of Federal Claims dismissed the complaint for lack of subject matter jurisdiction, finding the challenge barred under the Federal Acquisition Streamlining Act’s (FASA) task order protest prohibition because NGA’s development decision was “directly and causally related” to the issuance of a task order. Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093 (Fed. Cl. May 17, 2023). Percipient appealed.
Federal Circuit Panel (June 2024): A divided panel (2-1) reversed, holding that (1) Percipient’s allegations were not barred under the FASA task order bar because Percipient was not challenging the issuance of a task order, but rather the post-award failure to comply with section 3453; (2) the Tucker Act conferred jurisdiction because Percipient’s alleged section 3453 violation was “in connection with a procurement or a proposed procurement” under the so-called prong three of section 1491(b)(1); and (3) Percipient had standing to bring its claim challenging NGA’s decision to develop the software. See Percipient.ai, Inc. v. United States, 104 F.4th 839 (Fed. Cir. 2024).
Differentiating between challenges “in connection with” a procurement, and either solicitation challenges or award decisions, the Court concluded that interested party standing for alleged violations of 10 U.S.C. § 3453 without challenging the contract award, “includes an offeror of commercial or nondevelopmental services or items whose direct economic interest would be affected by the alleged violation of the statute.”Id.
En Banc Rehearing (August 2025): The Government successfully petitioned for en banc review. The full court vacated the panel decision and ordered briefing on the question of “[w]ho can be ‘an interested party objecting to . . . any alleged violation of a statute or regulation in connection with a procurement or a proposed procurement under 28 U.S.C. § 1491(b)(1).’”See Percipient.ai, Inc. v. United States, 153 F.4th 1226 (Fed. Cir. 2025).
In its resulting 7-4 decision, authored by Circuit Judge Hughes, the Court of Appeals affirmed the trial court dismissal holding that “an interested party is an actual or prospective bidder or offeror whose direct economic interest would be affected by the award of the contract or by failure to award the contract, regardless of the type of challenge brought[.]”Id. Therefore, Percipient lost its challenge. Because Percipient never bid (and could not have bid) on the SAFFIRE contract, it lacked standing.
Key takeaways:
- The commercial item procurement preference does not confer a separate bid protest right of action outside the parameters of the Tucker Act. Contractors cannot invoke 10 U.S.C. § 3453 to establish standing absent status as an actual or prospective bidder on the procurement at issue.
- Contractors must establish their “interested party” status under the Tucker Act. Regardless of whether a protester challenges a solicitation, an award, or an alleged statutory violation, standing requires that the protester be an actual or prospective bidder whose direct economic interest would be affected by the award or failure to award the contract.
- For traditional post-award bid protests, contractors must be an actual or prospective offeror with a direct economic interest. Am. Fed’n of Gov’t Employees v. United States, 258 F.3d 1294, 1302 (Fed. Cir. 2001).
- In pre-award bid protests, contractors must demonstrate a “non-trivial competitive injury which can be addressed by judicial relief.” Weeks Marine, Inc. v. United States, 575 F.3d 1352, 1362 (Fed. Cir. 2009).
- Where a solicitation restricts a contractor from participating in a competition, prospective bidders should consider challenging the terms of a solicitation or submitting a proposal or quote. If a solicitation contains improper or unduly restrictive requirements, contractors should consider filing a protest before quotes or proposals are due.
Percipient, a commercial provider of advanced analytics and artificial intelligence products, filed a 2023 bid protest challenging the National Geospatial-Intelligence Agency’s (NGA) decision to issue an order to CACI, Inc.—Federal for custom “computer vision” technology—a form of artificial intelligence that uses and trains computers to interpret visual information—rather than procure commercially available solutions. Percipient alleged that NGA violated the commercial item procurement preference under 10 U.S.C. § 3453, which requires agencies to acquire commercial products and services “to the maximum extent practicable.” Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093, (Fed. Cl. May 17, 2023).
Notably, Percipient had not bid on the underlying “SAFFIRE” contract—a single-award IDIQ contract for visual intelligence data collection and computer vision capabilities—because it lacked the capability to meet all solicitation requirements. Instead, Percipient awaited post-award market research where it expected to demonstrate that its commercial computer vision product could meet NGA’s needs and be incorporated into the procurement.
Procedural History
Court of Federal Claims (2023): The Court of Federal Claims dismissed the complaint for lack of subject matter jurisdiction, finding the challenge barred under the Federal Acquisition Streamlining Act’s (FASA) task order protest prohibition because NGA’s development decision was “directly and causally related” to the issuance of a task order. Percipient.ai, Inc. v. United States, No. 23-28C, 2023 WL 3563093 (Fed. Cl. May 17, 2023). Percipient appealed.
Federal Circuit Panel (June 2024): A divided panel (2-1) reversed, holding that (1) Percipient’s allegations were not barred under the FASA task order bar because Percipient was not challenging the issuance of a task order, but rather the post-award failure to comply with section 3453; (2) the Tucker Act conferred jurisdiction because Percipient’s alleged section 3453 violation was “in connection with a procurement or a proposed procurement” under the so-called prong three of section 1491(b)(1); and (3) Percipient had standing to bring its claim challenging NGA’s decision to develop the software. See Percipient.ai, Inc. v. United States, 104 F.4th 839 (Fed. Cir. 2024).
Differentiating between challenges “in connection with” a procurement, and either solicitation challenges or award decisions, the Court concluded that interested party standing for alleged violations of 10 U.S.C. § 3453 without challenging the contract award, “includes an offeror of commercial or nondevelopmental services or items whose direct economic interest would be affected by the alleged violation of the statute.”Id.
En Banc Rehearing (August 2025): The Government successfully petitioned for en banc review. The full court vacated the panel decision and ordered briefing on the question of “[w]ho can be ‘an interested party objecting to . . . any alleged violation of a statute or regulation in connection with a procurement or a proposed procurement under 28 U.S.C. § 1491(b)(1).’”See Percipient.ai, Inc. v. United States, 153 F.4th 1226 (Fed. Cir. 2025).
In its resulting 7-4 decision, authored by Circuit Judge Hughes, the Court of Appeals affirmed the trial court dismissal holding that “an interested party is an actual or prospective bidder or offeror whose direct economic interest would be affected by the award of the contract or by failure to award the contract, regardless of the type of challenge brought[.]”Id. Therefore, Percipient lost its challenge. Because Percipient never bid (and could not have bid) on the SAFFIRE contract, it lacked standing.
Key takeaways:
- The commercial item procurement preference does not confer a separate bid protest right of action outside the parameters of the Tucker Act. Contractors cannot invoke 10 U.S.C. § 3453 to establish standing absent status as an actual or prospective bidder on the procurement at issue.
- Contractors must establish their “interested party” status under the Tucker Act. Regardless of whether a protester challenges a solicitation, an award, or an alleged statutory violation, standing requires that the protester be an actual or prospective bidder whose direct economic interest would be affected by the award or failure to award the contract.
- For traditional post-award bid protests, contractors must be an actual or prospective offeror with a direct economic interest. Am. Fed’n of Gov’t Employees v. United States, 258 F.3d 1294, 1302 (Fed. Cir. 2001).
- In pre-award bid protests, contractors must demonstrate a “non-trivial competitive injury which can be addressed by judicial relief.” Weeks Marine, Inc. v. United States, 575 F.3d 1352, 1362 (Fed. Cir. 2009).
- Where a solicitation restricts a contractor from participating in a competition, prospective bidders should consider challenging the terms of a solicitation or submitting a proposal or quote. If a solicitation contains improper or unduly restrictive requirements, contractors should consider filing a protest before quotes or proposals are due.
Related Capabilities
© 2026 Jenner & Block LLP. Attorney Advertising. Jenner & Block LLP is an Illinois Limited Liability Partnership including professional corporations. This publication, presentation, or event is not intended to provide legal advice but to provide information on legal matters and/or firm news of interest to our clients and colleagues. Readers or attendees should seek specific legal advice before taking any action with respect to matters mentioned in this publication or at this event. The attorney responsible for this communication is Brent E. Kidwell, Jenner & Block LLP, 353 N. Clark Street, Chicago, IL 60654-3456. Prior results do not guarantee a similar outcome. Jenner & Block London LLP, an affiliate of Jenner & Block LLP, is a limited liability partnership established under the laws of the State of Delaware, USA and is authorised and regulated by the Solicitors Regulation Authority with SRA number 615729. Information regarding the data we collect and the rights you have over your data can be found in our Privacy Notice. For further inquiries, please contact dataprotection@jenner.com.
News and Insights
Publications
From Four Remedies to Multiple Pressures: The New Risk Model for Government Contractors and Grantees, Government Contractor
Partners David Robbins, Emily Loeb, and Matthew Haws and Associate Rachel Palermo authored an article for Government Contractor examining how the oversight landscape is changing for government contractors, grant recipients, universities, and nonprofits, and what general counsel and boards should do in response.
November 18, 2026
Recognition
Partner Lindsay Harrison Named a 2026 Law360 Real Estate MVP
Law360 named Lindsay Harrison, Co-Chair of the firm’s Real Estate and Hospitality Practice, a 2026 MVP in the Real Estate category.
November 18, 2026
Publications
In The American Lawyer, “My Client Is Often the Truth”: Neil Barofsky on What Matters Most
Partner Neil Barofsky, who was a finalist for Attorney of the Year at the publication’s 2026 Industry Awards, was profiled in The American Lawyer. The article examines what independence requires of a monitor or ombudsperson who oversees reforms after things have gone wrong and how that commitment has shaped his work.
November 16, 2026
Publications
New York Court Allows Attorney General’s Zelle Fraud Lawsuit to Proceed, In New York Law Journal
Partners Jeremy Creelan, Megan Poetzel, Laurel Loomis Rimon, and Michael Ross and Associate Julian Buff authored an article for the New York Law Journal examining a recent New York trial court decision allowing the New York Office of the Attorney General’s (OAG) lawsuit against Early Warning Services, LLC, the owner of the payment service Zelle, to proceed to discovery.
November 16, 2026
News
In Billboard, Partner Precious Jacobs Discusses the Rise in Artist-Manager Litigation
Partner Precious S. Jacobs was featured in Billboard in “It’s Not Just Timbaland: Why Are So Many Artists Suing Their Managers Right Now?.” The article examines the recent wave of lawsuits between music artists and their managers and why that relationship is so prone to conflict.
November 12, 2026
Event
Partner Terri Mascherin to Speak at Illinois State Bar Association Seminar on Negotiation Ethics
On November 11, Partner Terri Mascherin will join a faculty panel for the Illinois State Bar Association (ISBA) continuing legal education (CLE) seminar “Negotiation Ethics: Winning Without Selling Your Soul.”
November 11, 2026
Publications
Partner Emily Loeb Discusses Congressional Oversight Preparedness in The Washington Post’s Health Brief
Partner Emily Loeb, co-chair of Jenner & Block’s Congressional Investigations Practice, was quoted in The Washington Post’s Health Brief article examining how the 2026 midterm election results may reshape the health care policy landscape and the industry’s relationship with Washington.
November 10, 2026